A new energy manufacturing base in Huzhou, Zhejiang, specializing in energy storage equipment and hydrogen energy devices, required a high-load, highly collaborative lifting equipment cluster for its new assembly workshop. The workshop features a large span and high headroom, requiring multiple cranes to operate simultaneously, placing extreme demands on the stability and compatibility of the lifting system.

Needs Assessment & Solution Design

Harriet, Sales Manager at Yu’an Crane, collaborated with the technical team to define core requirements:

The technical team provided a tailored solution:

Custom Manufacturing & Quality Assurance

Production of the crane cluster began with customized specifications:

On-Site Installation & Commissioning

The installation team completed track laying, assembly, and cluster commissioning of 6 cranes in just 15 days:

Personnel Training & Client Feedback

A 3-day specialized training program was provided, focusing on multi-crane operation protocols and emergency response.

Since delivery, the new energy base has seen a 60% increase in assembly efficiency. The client’s Production Director commented:

“Yu’an’s crane cluster is perfectly suited to our new energy equipment manufacturing. The multi-machine collaboration is highly efficient, and the equipment operates stably and accurately—providing a solid foundation for our capacity expansion.”