Project Background

A new energy manufacturing base in Huzhou, Zhejiang, specializing in energy storage equipment and hydrogen energy devices, required a high-load, highly collaborative lifting equipment cluster for its new assembly workshop. The workshop features a large span and high headroom, requiring multiple cranes to operate simultaneously, placing extreme demands on the stability and compatibility of the lifting system.

Needs Assessment & Solution Design

Harriet, Sales Manager at Yu’an Crane, collaborated with the technical team to define core requirements:

  • A cluster consisting of 2 units of 20/5-ton double girder overhead cranes and 4 units of 10-ton single girder overhead cranes
  • 30m workshop span and 12m headroom, requiring full coverage and sufficient lifting height
  • Multi-crane simultaneous operation with anti-collision and precise positioning functions
  • Low-noise, stable operation to meet the precision manufacturing needs of the new energy industry

The technical team provided a tailored solution:

  • 20/5-ton double girder cranes feature lightweight main beams and high-precision variable frequency drives for accurate heavy component lifting
  • 10-ton single girder cranes are equipped with intelligent limit systems for multi-machine anti-collision
  • All units are coated with anti-corrosion material and fitted with dust-proof electrical boxes to meet clean production requirements

Custom Manufacturing & Quality Assurance

Production of the crane cluster began with customized specifications:

  • Double girder main beams are fabricated from Q355B high-strength steel, treated with shot blasting and epoxy zinc-rich coating
  • Core electrical components are sourced from Schneider for long-term stability under high loads
  • Each unit undergoes dynamic and static load testing, with anti-collision systems verified via multi-machine simulation
  • Mid-term factory inspections were conducted to verify lifting accuracy and collaborative performance

On-Site Installation & Commissioning

The installation team completed track laying, assembly, and cluster commissioning of 6 cranes in just 15 days:

  • Calibrated the travel precision of double girder cranes to ensure positioning errors of less than 5mm across the 30m span
  • Conducted multi-machine anti-collision system testing to ensure safe simultaneous operation
  • Final tests confirmed the cluster system can lift 20-ton heavy components and 10-ton precision modules simultaneously, fully meeting production needs

Personnel Training & Client Feedback

A 3-day specialized training program was provided, focusing on multi-crane operation protocols and emergency response.

Since delivery, the new energy base has seen a 60% increase in assembly efficiency. The client’s Production Director commented:

“Yu’an’s crane cluster is perfectly suited to our new energy equipment manufacturing. The multi-machine collaboration is highly efficient, and the equipment operates stably and accurately—providing a solid foundation for our capacity expansion.”

Delivers Multiple Overhead Crane to Mexico
Overhead Crane
Delivers Multiple Overhead Crane to Mexico

Customize Your Crane

Please write down the following information and we will contact you within 12 hours.